FIELD: construction.
SUBSTANCE: invention relates to construction of culverts in intersection areas by main pipelines of watercourses. Culvert under embankment contains set of concrete slabs laid along profile of stream channel profile, under waterproof perforated cloth made of non-woven synthetic material (NSM) placed on pile with working tube, laid on top of concrete slabs. Bottom and side plates are sealed, and top plates are laid across channel directly to side walls without sealing. With width of water mirror from 5 to 10 m, upper plates are laid along channel on beams located on side plates with calculated step across stream bed.
EFFECT: technical result is increase in operational reliability of pipeline by eliminating watercourse impact.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
CULVERT (VARIANTS) AND METHOD FOR ITS CONSTRUCTION | 2005 |
|
RU2303096C2 |
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
WATER CONVEYANCE STRUCTURE UNDER EMBANKMENT | 1995 |
|
RU2079599C1 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
TRANSITION OF PIPELINE THROUGH WATER OBSTACLE | 2015 |
|
RU2590930C1 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
WATER-ESCAPE STRUCTURE UNDER EMBANKMENT | 1998 |
|
RU2137972C1 |
METHOD OF REPAIRING SLUGGED OR ERODED SECTION OF PIPELINE | 2004 |
|
RU2285186C2 |
METHOD OF REINFORCEMENT OF LOOSE GROUNDS OF BASES AND SLOPES (VERSIONS) AND GEO-GRATE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2228479C1 |
Authors
Dates
2018-07-09—Published
2017-02-21—Filed