FIELD: oil producing industry. SUBSTANCE: fluid accumulated in operation of field in well bottoms and connecting lines may cause malfunction of well operation. Fluid is removed by blowing the connecting lines with the aid of gas ejector. In this case, each well is periodically connected to mixing chamber of gas ejector to whose inlet high-pressure gas is fed from booster compressor station, and mixed flow is directed to inlet of booster compressor station. Well blowing period is determined by temperature stabilization. EFFECT: higher efficiency and reduced maintenance costs. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
OPERATING METHOD OF WELLS AND GAS COLLECTION SYSTEM DURING COMPRESSOR PERIOD OF DEVELOPING GAS AND GAS CONDENSATE FIELDS | 2007 |
|
RU2346147C1 |
METHOD AND DEVICE FOR ELIMINATION OF LIQUID PLUGS IN GAS GATHERING HEADER | 2018 |
|
RU2687721C1 |
METHOD OF OPERATING GAS FIELD IN COLLECTOR-BEAM ARRANGEMENT SCHEME COLLECTION AT FINAL STAGE OF DEPOSIT DEVELOPMENT | 2015 |
|
RU2597390C1 |
METHOD FOR PREPARING NATURAL GAS FOR TRANSPORTATION | 2021 |
|
RU2794267C1 |
METHOD AND EJECTING DEVICE FOR OPERATION OF CLUSTERED GAS WELLS | 1994 |
|
RU2110673C1 |
METHOD FOR OPERATING GAS WELLS AT LATER STAGE OF NATURAL GAS FIELD DEVELOPMENT AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2760183C1 |
METHOD FOR PRODUCTION OF LOW-PRESSURE GAS | 2020 |
|
RU2748792C1 |
OPERATING METHOD OF FLOODED GAS WELLS, AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2484239C2 |
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION | 2020 |
|
RU2756650C1 |
METHOD OF GAS AND GAS CONDENSATE FIELDS PLUMS START UP AFTER IT LONG TERM SHUT DOWN | 2008 |
|
RU2377400C1 |
Authors
Dates
1994-08-15—Published
1990-11-19—Filed