FIELD: construction industry. SUBSTANCE: fluid is used as working medium. To determine presence of underground waters in space means for monitoring presence of underground waters is inserted into it. Its sensitive element is positioned in lowest point of space. Discharge of pumped out underground waters or of pumped-feed fluid, time of change of their level to fixed level equal to spacing of layer-by-layer estimation of cross-section of space, time of free restoration of level of underground waters or of outflow of fluid are measured and volume of space is calculated. Then level of underground waters, depth of lying of underground space and areas of cross-sections of each of layers of space by which its contour is judged are found. EFFECT: improved authenticity of determination of parameters. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING PARAMETERS OF HOLLOW IN GROUND | 0 |
|
SU1763567A1 |
ROLLER | 1995 |
|
RU2079596C1 |
MULTIPURPOSE BUILT-UP VESSEL (VERSIONS) AND METHOD OF ITS CONSTRUCTION (VERSIONS) | 2000 |
|
RU2191876C2 |
METHOD AND DEVICE FOR LAYING UNDERGROUND PIPELINE | 2006 |
|
RU2322629C1 |
METHOD FOR DEFINING WELL CHARACTERISTICS, FORMATION BOTTOM-HOLE ZONE | 2011 |
|
RU2459074C1 |
METHOD OF APPLICATION OF ELECTRICAL CENTRIFUGAL PUMP WITH MULTIPHASE PUMP AND PACKER | 2015 |
|
RU2620667C1 |
BOTTOM HOLE SEPARATOR | 2002 |
|
RU2269649C2 |
METHOD OF CONTINUOUS DISCRETE INDICATOR MARK SAMPLING FROM GAS HOLE AND DEVICE TO THIS END | 2007 |
|
RU2354826C2 |
WELL SURVEYING METHOD | 2013 |
|
RU2527960C1 |
METHOD FOR MONITORING TIGHTNESS OF INJECTION WELL (EMBODIMENTS) | 2017 |
|
RU2705683C2 |
Authors
Dates
1994-08-15—Published
1991-12-24—Filed