FIELD: oil and gas production.
SUBSTANCE: method for defining well characteristics, formation bottom-hole zone includes reagent pumping via tubing with closed tubular annulus, measurement of reagent flow rate at the well mouth and pumping pressure in bottom-hole zone. Measurement data is calculated for bottom-hole conditions. Accumulated flow rate and labour input per reagent flow unit in well bottom-hole zone is determined. These indices are used for definition of current formation conductivity change. Before reagent pumping fresh water is pumped into formation via tubing till well-head pressure reaches Phead=10 MPa with measurement of this pressure change in time and volume of pumped water. Their analysis is used to define initial conductivity of formation bottom-hole zone. After that there performed is an operation of bottom-hole treatment by reagent that is gassy fluid with water solution surfactant ML-81B or water solution of hydrochloric acid HCl. After that fresh water is pumped into formation similarly to the initial operation and final conductivity of formation bottom-hole zone is determined. After comparison of initial and final conductivity of bottom-hole zone there defined is a change of formation bottom-hole zone conductivities. If bottom-hole zone conductivity decreased or its increase is less than 10%, then additional treatment of bottom-hole zone is carried out by this or other reagent.
EFFECT: increase of efficiency of selection of the most effective process operation on improving formation bottom-hole zone conductivity depending upon the type of collector comprising it and simplification of defining well characteristics, formation bottom-hole zone process.
1 dwg, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING WELL, BOTTOM-HOLE ZONE AND FORMATION CHARACTERISTICS | 2001 |
|
RU2189443C1 |
PROCEDURE DETERMINING CHARACTERISTICS OF WELL, FACE ZONE AND POOL AND DEVICE FOR ITS REALIZATION | 2001 |
|
RU2179637C1 |
METHOD OF CLEANING BOTTOM-HOLE FORMATION ZONE OF INJECTION WELLS AFTER HYDRAULIC FRACTURING | 2015 |
|
RU2601879C1 |
METHOD FOR THERMO-CHEMICAL TREATMENT OF OIL RESERVOIR | 2018 |
|
RU2696714C1 |
WELL OPERATION METHOD | 1999 |
|
RU2151855C1 |
METHOD OF RUNNING WELL | 1999 |
|
RU2151856C1 |
PRODUCTIVE FORMATION DEVELOPMENT METHOD | 1999 |
|
RU2151859C1 |
METHOD OF HEATING FORMATION WITH HIGH-VISCOSITY AND BITUMINOUS OIL | 2023 |
|
RU2823935C1 |
METHOD OF WELL DEVELOPMENT BY CREATING DEPRESSION ON FORMATION | 2011 |
|
RU2451172C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506421C1 |
Authors
Dates
2012-08-20—Published
2011-03-22—Filed