FIELD: construction of horizontal drainage systems. SUBSTANCE: ditch excavation and laying of drainage tube with filter are carried alternately in cycles by grab bucket scoops. Ditch extracted by cycles has length equal to width of opening of grab bucket scoops. Drawdown is effected and part of water is returned to ditch at the moment of its excavation. When pipe layer is moving, ditch is backfilled with ground. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR FORMING DRAIN FROM LOOSE MATERIALS | 1990 |
|
RU2023820C1 |
NARROW-TRENCH METHOD OF HORIZONTAL DRAIN CONSTRUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2422586C1 |
METHOD FOR CLOSED DRAINAGE CONSTRUCTION AND DEVICE FOR ITS ACCOMPLISHMENT | 0 |
|
SU1714054A1 |
METHOD AND DEVICE FOR DRAINING MANIFOLD LAYING IN WATER-SATURATED GROUND | 2005 |
|
RU2320814C2 |
ARRANGEMENT FOR LAYING DRAINAGE SYSTEM | 1991 |
|
RU2013498C1 |
METHOD FOR DRIVING PIPELINES OVER SLOPES | 1999 |
|
RU2170796C2 |
METHOD LAYING UNDERGROUND PIPE LINE | 1995 |
|
RU2090795C1 |
METHOD OF RECONSTRUCTING OPEN HORIZONTAL DRAINAGE | 0 |
|
SU1557254A1 |
METHOD FOR CONSTRUCTION OF DRAIN IN WATER-BEARING GROUND | 0 |
|
SU1772316A1 |
METHOD OF COLNSTRUCTING HORIZONTAL DRAINAGE | 0 |
|
SU1395749A1 |
Authors
Dates
1994-08-30—Published
1990-08-08—Filed