FIELD: dredging and soil-shifting. SUBSTANCE: longitudinal vertical shields are pivotally connected to lateral vertical wall. An anchor is rigidly secured at bottom part of the wall. The top part of the wall is provided with anchors mounted through lever jaw. The jaw is pivotally connected to the wall for vertical displacement. A carrier is pivotally connected to the jaw. A slide is pivotally connected to the wall. Mechanism for working displacement is made of a pressing grab. EFFECT: enhance efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR LAYING DEEP-SEATED HORIZONTAL DRAINAGE SYSTEMS | 1990 |
|
RU2018578C1 |
ARRANGEMENT FOR LAYING DRAINAGE SYSTEM | 1991 |
|
RU2013498C1 |
DEVICE FOR PLACING CONCRETE | 1991 |
|
RU2049192C1 |
METHOD OF FORMING AN ANTISEEPAGE SCREEN OF THE FILM PANEL | 1991 |
|
RU2022090C1 |
DEVICE FOR PLACING CONCRETE | 1991 |
|
RU2049191C1 |
0 |
|
SU1781364A1 | |
METHOD FOR FORMING ANTIFILTRATING FILM SCREEN | 0 |
|
SU1705473A1 |
FILM SCREEN FORMING DEVICE | 0 |
|
SU1749352A1 |
METHOD OF FLEXIBLE FILM MATERIAL DIAPHRAGM ERECTION IN A TRENCH | 1991 |
|
RU2006548C1 |
METHOD AND DEVICE FOR ASSEMBLING ANTISEEPAGE SCREEN | 0 |
|
SU1763557A1 |
Authors
Dates
1994-11-30—Published
1990-12-10—Filed