FIELD: erection of underground pipe lines at slopes of route. SUBSTANCE: in laying the underground pipe line, longitudinal channels are dug on bottom of trench and are covered with watertight sheet material over perimeter, then channels are filled with filtering material and trench is covered with watertight mat together with pipe line laid in it, wells are filled and backfill is covered with side parts of mat. EFFECT: enhanced reliability. 5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BALLASTING SUBTERRANEAN PIPE LINE | 1998 |
|
RU2153119C2 |
UNDERGROUND PIPELINE ROUTING METHOD, AND DEVICE FOR ITS IMPLEMENTATION | 2011 |
|
RU2472053C1 |
METHOD TO INSTALL UNDERGROUND PIPELINE | 2011 |
|
RU2455551C1 |
UNDERGROUND PIPELINE ROUTING METHOD | 2011 |
|
RU2467240C1 |
METHOD AND DEVICE FOR LAYING PIPELINE | 2005 |
|
RU2274793C1 |
METHOD FOR FASTENING UNDERGROUND PIPELINES IN MELTING PERMAFROST GROUNDS | 1988 |
|
SU1565186A1 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
PROCESS OF LAYING PIPELINE | 0 |
|
SU1765593A1 |
METHOD OF LAYING UNDERGROUND PIPELINE | 0 |
|
SU1268860A1 |
Authors
Dates
1997-09-20—Published
1995-01-10—Filed