FIELD: mining industry. SUBSTANCE: roof rocks are caved by making undercut hollows, filling material is supplied with delay when driving hollows. Supply of filling material and driving of undercut hollows are discontinued when longitudinal displacement of material of pillar mass is detected, and the operations are resumed after pillar pressing. Device has guard shield with deflecting plate, filling material supply mechanism with unloading head. Deflecting plate is made with unloading port and inclined at angle for creeping of filling material prism. Filling material supply mechanism is installed for arrangement of said head in unloading port during its motion. EFFECT: higher efficiency. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING FLOODED DEPOSITS OF WATER-SOLUBLE MINERALS | 1999 |
|
RU2164601C1 |
METHOD OF ERECTING ARTIFICIAL PILLAR | 0 |
|
SU1190068A1 |
METHOD OF SUPPORTING MINE WORKINGS IN ADJACENT COAL SEAMS | 1999 |
|
RU2167301C1 |
DEVELOPMENT METHOD OF THICK STEEP COAL BEDS | 2011 |
|
RU2477795C1 |
METHOD OF PROTECTION OF WORKINGS IN WORKED-OUT AREA | 2008 |
|
RU2376472C1 |
METHOD FOR MINING ORE BODIES | 1994 |
|
RU2081320C1 |
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069755C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD FOR ROOF CONTROL | 1990 |
|
RU2011822C1 |
METHOD FOR KIMBERLITE PIPE CUTTING IN LAYERS IN UPWARD DIRECTION ALONG WITH GOAF FILLING | 2006 |
|
RU2309253C1 |
Authors
Dates
1994-08-30—Published
1990-11-05—Filed