FIELD: formation of pipeline in ground. SUBSTANCE: working and receiving pits are excavated in ground and pilot hole is made over design axis of pipeline. Pilot hole is sealed, and its hollow is filled with gaseous agent under pressure up to appearance of void water on ground surface. Before expansion of pilot hole it is filled with fluid-flow finely divided material under pressure exceeding pressure of infiltration of finally divided material into ground. Then, pilot hole is expanded up to design diameter of pipeline with pilot hole filled with finely divided material, and walls of expanded hole are faced. EFFECT: higher efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF FORMATION OF HORIZONTAL HOLES | 1998 |
|
RU2156847C2 |
METHOD OF THE PIPELINE REPAIRING BY APPLYING THE MULTILAYER COATING ON ITS INNER WALLS | 1990 |
|
RU2050984C1 |
METHOD OF PIPELINE REPAIRS | 1991 |
|
RU2007656C1 |
METHOD AND DEVICE FOR CLEANING INNER SURFACE OF PIPE LINE | 1992 |
|
RU2043174C1 |
METHOD TO PRODUCE WELLS IN SOIL FOR TRENCHLESS INSTALLATION OF UTILITIES (VERSIONS) | 2012 |
|
RU2495198C1 |
METHOD OF DRAW-IN PIPING IN GROUND (VERSIONS) | 2007 |
|
RU2344241C1 |
METHOD OF TRENCHLESS LAYING OF PIPELINES AND DEVICE FOR IMPLEMENTATION THEREOF | 2019 |
|
RU2730767C1 |
METHOD AND DEVICE FOR CREATION OF PIPELINE IN GROUND | 1996 |
|
RU2127346C1 |
DEVICE FOR SUPPLYING THE PASTY COMPOUND | 1991 |
|
RU2015745C1 |
FLOW LINE FOR LINING INTERNAL SURFACES OF PIPE-LINES | 1994 |
|
RU2048928C1 |
Authors
Dates
1994-09-15—Published
1991-12-13—Filed