FIELD: gas and oil producing industry. SUBSTANCE: method for well construction includes drilling of shaft, making upper and lower working platforms in it, vessel hydraulically communicated with drill string-casing annulus and bypass line with ground surface air-tight circulating system. Wellhead is equipped with sealing units arranged between lower and upper working platforms at distance ensuring location of members mounted in drill string and having outer diameter exceeding diameter of drill string itself. During further deepening of wellbore by drilling to design elevation, round-trip operations are effected through sealing units with maintenance of offset formation pressure. Before the last drilling, connected to drill string is first drill pipe from drill bit provided with cementing valve with inner diameter equalling diameter of designed flow string. Then, casing string is run into well and cemented. EFFECT: higher efficiency. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1989 |
|
SU1667431A1 |
METHOD OF WELL STAGE CEMENTING | 2001 |
|
RU2183728C1 |
DISCONNECTING DEVICE FOR TAIL COMPONENTS BEING CEMENTED WITH RESTING ON BOTTOM-HOLE | 1998 |
|
RU2149252C1 |
PROCESS OF OPENING OF PRODUCTIVE POOL | 2000 |
|
RU2175713C1 |
GEAR FOR GRADUAL PRESSURE GROUTING OF WELL | 2001 |
|
RU2182647C1 |
WELL CONSTRUCTION METHOD | 2011 |
|
RU2451149C1 |
WELL CONSTRUCTION METHOD | 2012 |
|
RU2474668C1 |
DEVICE FOR SECONDARY OPENING AND CREATING DEPRESSION UPON A LAYER | 2002 |
|
RU2229016C2 |
WAY OF SECONDARY DEVELOPMENT OF PRODUCTIVE POOL | 2001 |
|
RU2182650C1 |
WELL CONSTRUCTION METHOD | 2023 |
|
RU2806905C1 |
Authors
Dates
1994-10-15—Published
1989-11-15—Filed