FIELD: building of power stations without raising water in river by means of dam. SUBSTANCE: energy of flows of large cross section will be equal at inlet to energy in outlet flow. EFFECT: enhanced efficiency. 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| RUN-OF-RIVER PLANT POWER PLANT OF RUSSIAN ENGINEER SERGEJ TIMOFEEVICH ZHELEZNYAKOV | 2013 |
|
RU2557836C2 |
| WATER INTAKE STRUCTURE FOR RECEIVING WATER FROM MOUNTAIN AND FOOTHILL RIVERS FOR SMALL HPP | 2018 |
|
RU2694189C2 |
| FLOATING CRAFT FOR GENERATING ELECTRIC ENERGY BY UTILIZING KINETIC ENERGY OF WATER | 1992 |
|
RU2049924C1 |
| HYDROELECTRIC POWER STATION | 2006 |
|
RU2303707C1 |
| HYDROELECTRIC STATION | 2000 |
|
RU2171910C1 |
| DAMPLESS HYDROELECTRIC STATION | 2001 |
|
RU2221932C2 |
| MULTI-STORIED BUILDING | 1992 |
|
RU2037615C1 |
| TIDE POWER SYSTEM | 2004 |
|
RU2326264C2 |
| DAMLESS HYDRAULIC ELECTRIC POWER STATION | 2007 |
|
RU2376492C2 |
| BRIDGE VORTEX HYDRAULIC POWER PLANT | 1989 |
|
RU2012825C1 |
Authors
Dates
1994-10-30—Published
1990-06-01—Filed