FIELD: water development works. SUBSTANCE: method consists in forming boreholes 2 near bearing structure 1. Then vertical reinforced bodies 3 of quasirectangular-parallelepiped form are made in succession from each borehole 2. Bodies 3 are located separately from one another under bearing structure 1. Bodies 3 are made through destruction of soil structure by liquid jet 4 inclosed in air flow 5 formed artificially. Liquid is fed via pipe 6 and air is fed via pipe 7. In creating bodies 3, jet 4 is smoothly raised from their lower edge 8 to soil surface. Slabs 9 laid under contour of each body beforehand prevent jet from escaping into atmosphere. EFFECT: enhanced reliability. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REINFORCING FOUNDATION BASE | 1991 |
|
RU2014392C1 |
METHOD OF ARRANGING A GROUNDWORK IN THE PERMAFROSTS | 1991 |
|
RU2034955C1 |
DRILL-HOLE HYDRAULIC GIANT FOR MAKING SLITS IN GROUND | 1991 |
|
RU2014455C1 |
METHOD FOR CONSTRUCTION OF ANCHOR FASTENING | 1991 |
|
RU2014388C1 |
METHOD FOR CONSTRUCTING FOUNDATION FOR BUILDINGS ON SUBSIDING GROUND | 1991 |
|
RU2014394C1 |
METHOD AND DEVICE FOR CREATION OF ANTISEEPAGE DIAPHRAGM IN EARTH | 0 |
|
SU1772304A1 |
FOUNDATION | 0 |
|
SU1618841A1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245966C2 |
METHOD OF REINFORCING WATERFRONT SAFEGUARDING STRUCTURE | 0 |
|
SU1788125A1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245428C2 |
Authors
Dates
1995-01-09—Published
1991-09-16—Filed