FIELD: ice structures. SUBSTANCE: method consists in separating the base for the platform from ice field and forming the ice mass from ice blocks on the surface of the base. Platform base is arranged in the river delta, then two parallel slots are made in the channel, blocks are cut between slots thus forming clean water channel for floating the ice blocks to the ice platform. EFFECT: enhanced efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PIER | 2013 |
|
RU2535726C1 |
METHOD FOR INSTALLATION OF SUPERBLOCK ONTO BASE | 1991 |
|
RU2031198C1 |
METHOD OF PROTECTION OF WATER BASIN AGAINST FREEZING | 1990 |
|
RU2034953C1 |
METHOD AND DEVICE FOR PROTECTION OF PLANTS AGAINST FROSTS | 1992 |
|
RU2040151C1 |
FOUNDATION | 1991 |
|
RU2047690C1 |
SOLAR ENERGY ACCUMULATOR | 1991 |
|
RU2027121C1 |
CITY PLANNING AND ENERGY-SAVING COMPLEX | 2010 |
|
RU2450111C1 |
WATER COOLING DEVICE | 1990 |
|
RU2015481C1 |
SYSTEM FOR HEATING AND PROTECTION OF GROUND FROM FREEZING | 1991 |
|
RU2031195C1 |
DEVICE FOR DECREASING NONUNIFORM SETTLING OF PILE FOUNDATION | 1991 |
|
RU2044834C1 |
Authors
Dates
1995-01-09—Published
1991-09-16—Filed