FIELD: construction. SUBSTANCE: method for installation of superblock onto base includes formation of embankment. Plates are installed at corners of embankment. Ice layer 1-2 m thick is built up by freezing on plates, and on the remaining part of embankment ice layer is made with thickness equalling plate thickness. Then, superblock is moved and installed on plates. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
FOUNDATION | 1991 |
|
RU2047690C1 |
DEVICE FOR DECREASING NONUNIFORM SETTLING OF PILE FOUNDATION | 1991 |
|
RU2044834C1 |
METHOD OF ERECTION OF ICE PLATFORM | 1991 |
|
RU2026475C1 |
FOUNDATION OF PILES AND SLABS | 2007 |
|
RU2331738C1 |
BRIDGE ABUTMENT | 2022 |
|
RU2808016C1 |
METHOD FOR CONSTRUCTION OF GROUP PILE FOUNDATION FOR BORING AND OPERATION OF WELLS IN OIL AND GAS DEPOSITS | 2007 |
|
RU2353727C1 |
SINGLE-PILE-SLABBY FOUNDATION | 2016 |
|
RU2638664C2 |
METHOD FOR ERECTION OF PIPE FOUNDATION | 0 |
|
SU1794998A1 |
METHOD FOR CONSTRUCTION OF PILE-PLATE FOUNDATION | 2021 |
|
RU2774443C1 |
TRANSPORTATION AND ENERGY SYSTEM OF RUSSIA | 2012 |
|
RU2520972C2 |
Authors
Dates
1995-03-20—Published
1991-12-10—Filed