FIELD: civil engineering. SUBSTANCE: device is made in the form of a pair of one-piece prestressed flexible members located in vertical planes on both sides of piles in one row, and rigidly fixed with ends on terminal piles of this row to generate two broken lines with bending points located correspondingly in upper and lower zones of above ground part of intermediate piles. The intermediate piles are provided with pulley blocks to throw flexible members over those. Row of three piles may be used in swelling soils. EFFECT: preventing nonuniform settling. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INSTALLATION OF SUPERBLOCK ONTO BASE | 1991 |
|
RU2031198C1 |
SYSTEM FOR STABILIZING TEMPERATURE CONDITIONS OF SOIL | 1993 |
|
RU2048746C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES | 1993 |
|
RU2068916C1 |
LOW-RISE ENERGY-PRODUCING BUILDING | 2012 |
|
RU2526031C2 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
FOUNDATION | 2006 |
|
RU2320820C1 |
DEVICE FOR REDUCING DEFORMATION OF RESERVOIRS AND FENCE WALLS | 2000 |
|
RU2171338C1 |
0 |
|
SU1783074A1 | |
METHOD TO CONTROL DISPLACEMENT, SETTING AND HEELING OF STRUCTURE BY PILED FOUNDATIONS, BEING MACROREGULATORS | 2008 |
|
RU2416696C2 |
Authors
Dates
1995-09-27—Published
1991-10-22—Filed