FIELD: civil engineering. SUBSTANCE: shell of pile foundation has circular cross-section, and a metal tip. The tip has a holder on the upper face. The holder is inserted in shell cavity. Shaft is of rectangular cross-section. Shaft diagonal equals shell internal diameter. The shell is inserted down to the depth not exceeding allowable foundation settlement. Then the shaft is inserted into the cavity up to the stop. The shaft and the tip are inserted down to design level. EFFECT: fast manufacturing the foundation. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PILE FOUNDATION AND FOUNDATION ERECTION METHOD | 2003 |
|
RU2256748C2 |
METHOD FOR PILE FORMING IN BASE HAVING WEAK GROUND INTERLAYERS | 2004 |
|
RU2272867C1 |
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) | 2017 |
|
RU2663420C1 |
DRIVE PILE DEVICE IN PUNCHED WELL WITH WIDER BASE | 2014 |
|
RU2582530C2 |
METHOD OF BUILDING FOUNDATION FOR RESERVOIR | 2002 |
|
RU2209884C1 |
FOUNDATION | 1999 |
|
RU2171337C1 |
DEVICE FOR DETERMINING LOAD-BEARING CAPACITY OF PILE | 0 |
|
SU1656081A1 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
METHOD TO ERECT PILE FOUNDATION | 2011 |
|
RU2456408C1 |
METHOD FOR CONSTRUCTION OF PILE FOUNDATION | 0 |
|
SU1678976A1 |
Authors
Dates
1995-01-20—Published
1991-07-08—Filed