FIELD: mining industry. SUBSTANCE: to speed up the comparison of results of quick testing with results of trial operation and estimation of effectiveness of water shutoff work, beds are opened by drilling with use of polymer mud without solid phase, water shutoff is effected by injection of polymer mud into bed at excessive pressure up to 10 MPa for an hour, and quick test is carried out for 2-3 h before and after the shutoff work. Trial operation is carried out for 1-2 days by moving tool with packer. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
BOREHOLE RUNNING IN METHOD | 1992 |
|
RU2039214C1 |
METHOD FOR FORMATION TESTING | 1989 |
|
RU2017952C1 |
METHOD FOR DETERMINATION OF ATTITUDE OF OIL-WATER CONTACT | 1991 |
|
RU2012793C1 |
DEVICE FOR BOREHOLE TESTING | 1992 |
|
RU2072042C1 |
FORMATION EVALUATION METHOD | 0 |
|
SU1789017A3 |
FORMATION TESTER | 0 |
|
SU1802108A1 |
METHOD FOR TESTING FORMATIONS | 0 |
|
SU1802107A1 |
FORMATION TESTING METHOD | 0 |
|
SU1796018A3 |
DEVICE FOR INDUCING INFLOW OF FORMATION FLUID | 1991 |
|
RU2015317C1 |
METHOD FOR OPENING PRODUCTIVE SEAMS | 1993 |
|
RU2072030C1 |
Authors
Dates
1995-01-20—Published
1992-01-27—Filed