FIELD: oil, gas production. SUBSTANCE: well is drilled to reach productive seam. First gas-saturated strata is open with gas-oil strata available. Gas-insulating screen is installed in it. Then oil-saturated strata is open. Breakdown is carried out in this strata. Breakdown fracture is longer than extension of trouble zone of the oil-saturated strata, but shorter than extension of gas-insulating screen. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINATION OF ATTITUDE OF OIL-WATER CONTACT | 1991 |
|
RU2012793C1 |
BOREHOLE RUNNING IN METHOD | 1992 |
|
RU2039214C1 |
METHOD FOR TESTING BEDS IN WELL DRILLING | 1992 |
|
RU2026965C1 |
DEVICE FOR INDUCING INFLOW OF FORMATION FLUID | 1991 |
|
RU2015317C1 |
DRILLING FLUID | 1991 |
|
RU2012585C1 |
DEVICE FOR BOREHOLE TESTING | 1992 |
|
RU2072042C1 |
METHOD FOR FORMATION TESTING | 1989 |
|
RU2017952C1 |
CLAYLESS DRILLING MUD FOR BREAKING HIGH-PRODUCTIVE STRATUM | 1992 |
|
RU2019552C1 |
DRILLING MUD | 1991 |
|
RU2013434C1 |
FORMATION EVALUATION METHOD | 0 |
|
SU1789017A3 |
Authors
Dates
1997-01-20—Published
1993-06-03—Filed