FIELD: peat production process. SUBSTANCE: method for peat production includes excavation of raw peat from deposit, transportation to drying areas with formation of heaps according to the width of sheet and subsequent layer working of help. Process operations of layer working is carried out for one run over the entire width of heap in advancing along it of bridge equipment with lifting-lowering truss on which process equipment is mounted, with bridge equipment resting on peat deposit underlying the heap. The truss span of bridge equipment covers the heap width. EFFECT: prolonged season of peat mining and reduced process brakes due to preclusion of dependence of process equipment cross-country capability and increased season peat output. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF MOLDED PEAT | 1992 |
|
RU2024755C1 |
PROCESS OF EXTRACTION OF PEAT FROM PEAT BED | 1997 |
|
RU2146004C1 |
METHOD OF RECOVERING PEAT FROM FLOODED PEAT FIELDS | 0 |
|
SU1399469A1 |
METHOD FOR PRODUCTION OF MILLED PEAT AND DEVICE FOR ITS REALIZATION | 0 |
|
SU1810550A1 |
METHOD OF CONTROLLING THE PICKING OF CRUMB PEAT | 0 |
|
SU1381269A1 |
METHOD OF WINNING PEAT | 0 |
|
SU1355713A1 |
METHOD FOR PEAT EXTRACTION WITHOUT DISTURBANCE OF ITS STRUCTURE | 1990 |
|
RU2018671C1 |
METHOD OF MINING PEAT | 0 |
|
SU941590A1 |
METHOD OF PRODUCING GARDEN AND COMBUSTIBLE PEAT | 2012 |
|
RU2499141C1 |
METHOD OF MINING PEAT DEPOSIT | 0 |
|
SU1606697A1 |
Authors
Dates
1995-01-20—Published
1992-01-09—Filed