FIELD: power engineering. SUBSTANCE: fuel preparation system has line for supply of source material which is connected with grinding device, ready product line, large particles return line, reservoir which is brought in communication with large particles return line at its outlet, two thin-layer thickeners mounted in succession, jigging machine or any other ore-dressing apparatus operating in closed cycle with grinding device and thin layer thickener, converter which ensures smooth mixing of pulp to required consistence before feeding it to thickener with the aid of pulp pump, pulp former connected with vacuum pump and pulp pump feeding ready product for burning in burners of the boiler furnace. EFFECT: enhanced reliability. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM OF PREPARATION OF SOLID FUEL FOR BURNING | 1995 |
|
RU2080519C1 |
SYSTEM FOR PREPARING SOLID FUEL FOR BURNING UP | 0 |
|
SU1455139A1 |
PRODUCTION LINE FOR RECOVERY OF NOBLE METALS FROM ROCKS | 1994 |
|
RU2068301C1 |
THIN-LAYER THICKENER | 1994 |
|
RU2081671C1 |
METHOD FOR COAL-WATER FUEL PRODUCTION | 2010 |
|
RU2439131C1 |
PRODUCTION LINE FOR HYDRAULIC SEPARATION OF ASH AND SLAG FROM ASH-AND-SLAG WASTES | 1993 |
|
RU2074340C1 |
CONCENTRATION UNIT | 1992 |
|
RU2033270C1 |
CONTINUOUS-FLOW PROCESS LINE FOR PROCESSING METAL-CONTAINING MIXTURE OF PLACERS | 1994 |
|
RU2078616C1 |
METHOD FOR PROCESSING SULFIDE MATERIALS | 1997 |
|
RU2117060C1 |
LINE FOR PROCESSING GOLD-CONTAINING RAW MATERIALS OF MAN-GENERAL DEPOSITS | 2021 |
|
RU2763829C1 |
Authors
Dates
1995-01-20—Published
1992-12-07—Filed