FIELD: construction. SUBSTANCE: method for pile installation includes sinking of casing plugged from below for the period of sinking; formation of broadened space by ramming dry concrete mix by portions through casing; withdrawal of casing with subsequent embedding of stem pointed from below into broadened space. Stem is embedded through value determined by given relationship. EFFECT: higher efficiency. 9 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR RAMMING LOOSE MIXTURE WHEN INSTALLING PILE | 1991 |
|
RU2027826C1 |
INSTALLATION FOR MAKING WIDER PORTION OF PILE | 1992 |
|
RU2045622C1 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) | 2017 |
|
RU2663420C1 |
GROUND ANCHOR OR DRILLING PILE AND MANUFACTURING METHOD OF GROUND ANCHOR OR DRILLING PILE | 2013 |
|
RU2543842C1 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD OF PRODUCTION OF CEMENT-WATER SUSPENSION AND DEVICE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2257294C1 |
Authors
Dates
1995-01-27—Published
1991-09-06—Filed