FIELD: construction. SUBSTANCE: arranged on the base of one tank of tank farm is construction site where all tanks are assembled, and tanks ready for use are transported and installed on design bases. EFFECT: reduced time for construction and cut down material expenditures. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING RESERVOIR WITH FLOATING COATING AND DEVICE FOR MAKING FLOATING COATING | 1991 |
|
RU2033375C1 |
METHOD OF ESTIMATION OF BUOYANCY AND STABILITY OF FLOATING TOP OF RESERVOIR | 1991 |
|
RU2033374C1 |
VERTICAL CYLINDRICAL RESERVOIR FOR CRUDE OIL AND OIL PRODUCTS | 1991 |
|
RU2022112C1 |
METHOD AND DEVICE FOR CYLINDRICAL RESERVOIR ERECTION BY TOP-DOWN CONSTRUCTION METHOD | 2003 |
|
RU2261313C2 |
DEVICE FOR MOUNTING OF VERTICAL CYLINDRICAL STORAGE TANKS | 1995 |
|
RU2079621C1 |
METHOD FOR MOUNTING OF STRUCTURES | 1992 |
|
RU2018604C1 |
CONSTRUCTION METHOD OF NUCLEAR POWER STATIONS AND SPECIAL FACILITIES | 2012 |
|
RU2508434C1 |
METHOD OF MODULAR RECONSTRUCTION OF BUILDINGS | 2018 |
|
RU2683721C1 |
MANUFACTURING METHOD FOR INTEGRATED INDUSTRIAL COMPLEX ON GRAVITY BASED STRUCTURE (GBS) | 2021 |
|
RU2757517C1 |
RESERVOIR CONSTRUCTION METHOD | 2004 |
|
RU2264504C1 |
Authors
Dates
1995-02-09—Published
1991-06-28—Filed