FIELD: production of high-viscosity oil. SUBSTANCE: parallel shafts are drilled from day surface to open the producing formation through its thickness and between shafts and parallel to them are steam-supply, gas-withdrawal and lifting wells are drilled. Working chamber is made between shafts in lower part of producing formation. Drilled from this chamber in two stages are horizontal holes - pressure holes in upper stage, and producing holes in lower stage, and above holes are provided with casing and tubing. Through tubing heat carrier is supplied to pressure holes and at the same time through interpipe space between them and casings is supplied displacing agent. Chamber is tightly isolated from mine atmosphere. Oil pumped to surface by air lift. EFFECT: higher efficiency. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DESIGN OF UNDERGROUND MULTIHOLE WELL, METHOD FOR ITS CONSTRUCTION AND METHOD FOR ITS OPERATION | 1992 |
|
RU2054530C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS | 2008 |
|
RU2363839C1 |
PROCEDURE FOR DEVELOPMENT OF BITUMEN DEPOSITS | 2008 |
|
RU2363838C1 |
METHOD FOR OIL PRODUCTION BY UNDERGROUND HORIZONTAL WELLS | 2007 |
|
RU2354817C1 |
OIL PRODUCTION METHOD | 1998 |
|
RU2139417C1 |
WELL GAS-TURBINE-NUCLEAR OIL-AND-GAS PRODUCING COMPLEX (PLANT) | 2017 |
|
RU2652909C1 |
METHOD OF HIGH VICOUS OIL AND BITUMEN DEPOSITS DEVELOPMENT | 2006 |
|
RU2330950C1 |
COMBINED METHOD OF THERMAL WELL DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT | 2010 |
|
RU2425211C1 |
METHOD OF RECOVERY OF VISCOUS OIL WITH HEAT STIMULATION OF FORMATION | 2000 |
|
RU2211318C2 |
Authors
Dates
1995-02-20—Published
1992-07-06—Filed