FIELD: mining industry. SUBSTANCE: method for rock mass breaking includes drilling of rows of blastholes at preset base with subsequent action of breaking force on blasthole walls and excavation of broken mass. Two neighboring blastholes on one base of each row are drilled convergent with overdrill to a depth not in excess of 10-15% of length of convergent part. Then, alternately breaking force is acted on blasthole walls over their working length in direction of shortest distance between generating lines in neighboring blastholes in vertical plane and in counterdirection parallel to bottom hole plane between neighboring blastholes in horizontal plane. After excavation of outlined by cracks and broken part of rock mass, preparation is performed and breaking of next layer of rock mass by its drilling from blasthole sleeves is proceeded. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRIVING VERTICAL SHAFT | 2002 |
|
RU2229602C2 |
METHOD OF ROCKS BREAKAGE | 2001 |
|
RU2186969C1 |
METHOD OF DRIVING A HORIZONTAL MINE WORKING | 0 |
|
SU1751310A1 |
METHOD OF ROCKS BREAKAGE | 2000 |
|
RU2167293C1 |
METHOD OF IMPROVING STABILITY OF MINE ROCKS | 0 |
|
SU1578408A1 |
METHOD FOR COMBINED MINING OF THICK ORE BODIES | 1992 |
|
RU2030581C1 |
METHOD OF COVER CAVING | 1999 |
|
RU2163968C2 |
ROCK CUTTING METHOD | 2004 |
|
RU2260122C1 |
METHOD FOR DRILLING AND BLASTING OPERATIONS IN OPEN CUTS | 1999 |
|
RU2154254C1 |
METHOD OF BREAKING-OUT ROCK IN BLOCKS | 0 |
|
SU1476127A1 |
Authors
Dates
1995-02-20—Published
1992-04-29—Filed