FIELD: construction. SUBSTANCE: method includes through holes drilling in walls of a building and coaxial holes in beams. Then perforated injectors should be installed in these holes and hardening composition should be pumped through the injectors. On completion hardening composition feed the injectors are capped and left in beams as reinforcing members. EFFECT: effective recovery of beams properties. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO REINFORCE BEAM AND GIRDER FLOOR IN A BUILDING | 1992 |
|
RU2029843C1 |
DEVICE TO STRENGTHEN VAULTED FLOOR OF A BUILDING UNDER RECONSTRUCTION | 1991 |
|
RU2036290C1 |
METHOD FOR TIMBER FLOOR STRUCTURE RECONSTRUCTION | 2006 |
|
RU2308587C1 |
DEVICE FOR RECONSTRUCTION OF WOODEN FLOOR | 1993 |
|
RU2049884C1 |
METHOD TO REINFORCE WOODEN BEAMS OF FLOOR SLABS | 2012 |
|
RU2496957C1 |
METHOD OF INSTALLING FLOOR SLAB IN REPAIRING BUILDING | 0 |
|
SU1754862A1 |
PROCESS OF ERECTION OF UNDERGROUND STRUCTURE | 2001 |
|
RU2198263C1 |
METHOD OF RECONSTRUCTION OF THE STONE BUILDING | 2017 |
|
RU2668888C1 |
DEVICE FOR REINFORCEMENT OF BUILDING COVERING | 0 |
|
SU1838552A3 |
METHOD TO MANUFACTURE SLABS IN WOODEN LOW-RISE BUILDINGS | 2011 |
|
RU2478763C1 |
Authors
Dates
1995-02-27—Published
1992-01-23—Filed