FIELD: construction, particularly to create reinforced concrete floor panel during reconstruction of building having timber floor structure.
SUBSTANCE: method involves preparing old floor assembly along with mounting post installation under each joist in support and span parts thereof; arranging mesh reinforcement and pouring concrete mix; demounting old floor structure as concrete gains necessary strength. Timber joists are preliminarily cut in area of timber joist connection to wall and old timber floor structure is used as removable form. Old floor structure is demounted with the use of cable, pulley and winch system fastened to new floor panel. Cables pass through orifices created in new floor panel.
EFFECT: decreased labor inputs.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECONSTRUCTION AND VERTICAL EXTENSION OF BUILDINGS | 2015 |
|
RU2598615C1 |
METHOD OF RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2023 |
|
RU2820548C1 |
PROCESS OF ERECTION OF MONOLITHIC FRAMES | 1999 |
|
RU2206673C2 |
REINFORCED CONCRETE ELEMENT CONNECTION METHOD | 2007 |
|
RU2350718C1 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
METHOD OF MULTISTOREY BUILDING CARCASSING | 2007 |
|
RU2338843C1 |
METHOD TO STRENGTHEN REINFORCED CONCRETE ELEMENTS AND THEIR COUPLINGS | 2010 |
|
RU2476655C2 |
METHOD OF INSTALLING FLOOR SLAB IN REPAIRING BUILDING | 0 |
|
SU1754862A1 |
METHOD OF ERECTING LARGE-SPAN CEILINGS AND COATINGS | 2020 |
|
RU2734511C1 |
MONOLITHIC REINFORCED CONCRETE FLOOR | 2022 |
|
RU2790092C1 |
Authors
Dates
2007-10-20—Published
2006-05-03—Filed