FIELD: mining. SUBSTANCE: operation to disrupt and excavate Kimberly ore is carried out concurrently by drilling descending well and descending ore excavation. Drilling is carried out from the surface by consequent development kimberlite pipe over perimeter. Drilling is initiated from the center of kimberlite pipe and each subsequent row of wells is drilled out with diameter greater than previous one. Drilling any subsequent row is initiated after previous row has been abandoned. In doing so well abandoning is performed by pressing grouting solutions on the base of kimberlite production wastes. EFFECT: environmental protection by reuse of production wastes. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO SEPARATE UNDERGROUND FIRES | 1991 |
|
RU2029875C1 |
METHOD FOR EXTINGUISHING UNDERGROUND FIRES | 1990 |
|
SU1834390A1 |
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS | 1990 |
|
RU2095574C1 |
METHOD FOR CONTROLLING STANDARD OF PLUGGING IN ERECTION OF MINE WORKINGS | 1991 |
|
RU2014463C1 |
METHOD FOR REDUCING ADVERSE EFFECT OF UNDERGROUND WORKINGS ON GROUND SURFACE | 1991 |
|
RU2014396C1 |
METHOD OF ELIMINATING ABSORPTION IN ROCK WHEN DRIVING MINE WORKINGS | 0 |
|
SU1606699A1 |
METHOD OF ELIMINATING SUDDEN SURGES OF WATER TO WORKING FACE OF A WORKING BEING DRIVEN | 0 |
|
SU1401142A1 |
METHOD OF ISOLATING VERTICAL MINE WORKINGS FROM SUBSOIL WATER INFLOW | 0 |
|
SU1352067A1 |
METHOD FOR QUALITY CONTROL OF GROUTING IN CONSTRUCTING LONG ANTI-FILTERING CURTAINS | 1988 |
|
SU1832845A1 |
METHOD OF HYDRO-ISOLATION AND CONSOLIDATION OF MOUNTAIN-MASS WHILE TUNNELING | 0 |
|