FIELD: mining to work out underground power ore field under large depths. SUBSTANCE: method includes block preparation, compensating chamber generation, breaking down the minerals into the chambers by concentric vertical layers with incoming radial ore mining, determination of maximum stress direction in the formation, formation of alternate compensating chambers of different volume in ore formation, with compensating chambers of enlarged size being formed in areas of increased stress concentration. EFFECT: large depth mining. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF DEVELOPMENT OF SHOCK-RISKY ORE DEPOSITS | 2001 |
|
RU2190099C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES IN PERMAFROST ZONE | 1997 |
|
RU2132462C1 |
METHOD OF MINING OF THICK HARD ROCKS DEPOSITS AT GREAT DEPTHS | 2001 |
|
RU2186980C1 |
METHOD FOR DEVELOPING KIMBERLITE PIPE IN ASCENDING PROCEDURE WITH DRY GOBBING | 1997 |
|
RU2132461C1 |
METHOD OF MINING OF THICK DEPOSITS IN UNSTABLE MASSIF | 2000 |
|
RU2182663C2 |
METHOD OF MINING BLIND OREBODIES UNDER PROTECTED OBJECTS | 1998 |
|
RU2147683C1 |
METHOD FOR DEVELOPMENT OF STEEP ORE BODIES | 1996 |
|
RU2117761C1 |
METHOD FOR MINING STEEP ORE DEPOSITS BY INDUCED LEVEL CAVING WITH LONGWALL STOPING | 1997 |
|
RU2114306C1 |
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
METHOD FOR WARNING ABOUT DYNAMIC OCCURRENCES AT INDUSTRIAL EXPLOSIONS | 1998 |
|
RU2148718C1 |
Authors
Dates
1995-02-27—Published
1991-07-15—Filed