FIELD: railway building. SUBSTANCE: track-laying machine has tractor 1 with semitrailer 2 for carrying rail lengths 5. Semitrailer 2 is furnished with roller conveyor 3 for laying rail lengths 5. Rail length 5 is transported together with fitted-on jib 6 which carries anchor 7. Thanks to it temporary fastening of length with length laid before is provided and end of rail length to be butt-joined can be shifted along and across rail track. EFFECT: enlarged operating capabilities. 2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
TRACTOR TRACK LAYER | 2023 |
|
RU2808047C1 |
TRACK-LAYING MACHINE | 1999 |
|
RU2140478C1 |
COMBINATION RAIL/WHEEL MOUNTED TRACK-LAYING MACHINE | 0 |
|
SU1318624A1 |
METHOD OF TRACK LAYING AT RESTORATION OF PERMANENT WAY | 1995 |
|
RU2099465C1 |
TRACK LAYER | 0 |
|
SU1664944A1 |
0 |
|
SU308138A1 | |
CROSS-MEMBER OF TRACK LAYING CRANE | 1992 |
|
RU2026447C1 |
CANTILEVER TRACK-LAYING MACHINE FOR CHANGING SWITCH UNITS (VERSIONS) | 2001 |
|
RU2222658C2 |
TRACK LAYING VEHICLE | 0 |
|
SU1030455A1 |
DEVICE TO LAY RAIL LENGTHS | 2012 |
|
RU2499862C2 |
Authors
Dates
1995-03-20—Published
1992-05-14—Filed