FIELD: railway transport; track laying, maintenance and repair. SUBSTANCE: track-laying machine has prime mover 1 with pneumatic wheels, telescopic boom 11 with rail grips. Boom is installed through posts 9, 10 turnable by drive in vertical plane on platform 8 turnable in horizontal plane by drive. One end of frame 2 is connected with prime mover. Pneumatic wheels 3 and track bogies 4 are installed on other end of frame 2. Track bogies are 4 are installed on two tie-rods 5 spaced along frame and turnable in vertical plane by drive 6 for engagement with pneumatic wheels 4 for lifting the wheels and bringing them behind rear end face part of frame. Post 10 of boom 11, rear in operating position, is adjustable in length. EFFECT: improved mobility of track-laying machine, prevention of destruction of formation. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
TRACK-LAYING MACHINE | 1999 |
|
RU2143513C1 |
COMBINATION RAIL/WHEEL MOUNTED TRACK-LAYING MACHINE | 0 |
|
SU1318624A1 |
TRACTOR TRACK LAYER | 2023 |
|
RU2808047C1 |
TRACK-LAYING MACHINE ON ROAD/RAIL UNDERCARRIAGE | 0 |
|
SU1444453A2 |
TRACK LAYER | 0 |
|
SU1664944A1 |
CANTILEVER TRACK-LAYING MACHINE FOR CHANGING SWITCH UNITS (VERSIONS) | 2001 |
|
RU2222658C2 |
PORTABLE UNIT FOR REMOVING, STOWING AND TRANSPORTING RAIL-SLEEPER UNITS | 0 |
|
SU1524816A3 |
RAIL SECTION ASSEMBLING COMPLEX | 2000 |
|
RU2167972C1 |
TRACK-LAYING MACHINE | 1992 |
|
RU2031192C1 |
0 |
|
SU308138A1 |
Authors
Dates
1999-10-27—Published
1999-03-24—Filed