FIELD: ship-building technology. SUBSTANCE: method of building and launching consists in building large-size floating structures on floating reservoirs 2 combined by common pontoon deck 3; reservoirs 2 are located in two or more dry docks 1 arranged in parallel. Reservoirs 2 are provided with submergence and surfacing systems. Pontoon deck 3 covers width of each dock 1 fully or partially and distance between them. Pontoon deck 3 may carry building cranes which are shifted to stationary platforms in end portion of docks upon completion of building of large-size structure. Upon completion of building of large-size structures, docks 1 are filled to take reservoirs 2 off supports and bring them out of docks, after which they are flooded in water basin till large-size structure gets afloat. Reservoirs 2 are blown with compressed air and are returned to dry docks 1 for building next structure. Pumping out the docks may be replaced by ballasting reservoirs 2. EFFECT: enhanced reliability. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOATING DOCK FOR CONSTRUCTION OF OBJECTS WITH NON-MARINE OUTLINES | 2014 |
|
RU2581430C1 |
0 |
|
SU1781384A1 | |
DEVICE FOR BUILDING AND LAUNCHING LARGE-SIZE FLOATING STRUCTURES | 1993 |
|
RU2088467C1 |
ARRANGEMENT FOR CONSTRUCTING A FLOATING CRANE | 0 |
|
SU1017582A1 |
WAY OF LOADING, TRANSPORTING AND INSTALLATION OF HEAVY AND LARGE SUBSEA DEVICE ON THE SEABED | 2016 |
|
RU2619154C1 |
0 |
|
SU491534A1 | |
METHOD FOR ERECTION OF OBJECTS | 2008 |
|
RU2360826C1 |
MANUFACTURING METHOD FOR INTEGRATED INDUSTRIAL COMPLEX ON GRAVITY BASED STRUCTURE (GBS) | 2021 |
|
RU2757517C1 |
METHOD FOR CONSTRUCTION OF FLOATING STRUCTURES | 2010 |
|
RU2441799C2 |
METHOD FOR BUILDING AND LAUNCHING SELF-LIFTING FLOATING DRILLING PLATFORM | 0 |
|
SU1131759A1 |
Authors
Dates
1995-04-10—Published
1992-07-23—Filed