FIELD: construction.
SUBSTANCE: method for erection of objects includes preparation of construction site, object construction, separation of erected object from construction site together with part of construction site and final installation of erected object with completion of construction works. Construction site used is frozen surface of water reservoir. Preparation of construction site is carried out by erection of heat insulating temporary volume coat above construction site or its part in the form of structure. At that construction of erected object or its components is carried out inside specified structure. After object erection temporary volume coat is dismantled. Invention makes it possible to use seasonal (winter) time for performance of the main, most laborious works in erection of construction objects.
EFFECT: simplification of objects assembly and lower costs of their erection.
15 cl
Title | Year | Author | Number |
---|---|---|---|
ICE BERTH | 2021 |
|
RU2764806C1 |
CONSTRUCTION METHOD OF NUCLEAR POWER STATIONS AND SPECIAL FACILITIES | 2012 |
|
RU2508434C1 |
METHOD OF ICE COVER DESTRUCTION AND DEVICE FOR ICE COVER DESTRUCTION | 2014 |
|
RU2552753C1 |
METHOD AND APPARATUS FOR PAPERFORMING ENGINEERING WORK WITH ICE | 0 |
|
SU1059050A1 |
ICE MOORING CONSTRUCTION METHOD IN ARCTIC CONDITIONS | 2019 |
|
RU2715034C1 |
METHOD AND APPARATUS FOR PROTECTING SELLTING POND AGAINST OVERCOOLING | 0 |
|
SU1130665A1 |
METHOD FOR CONSTRUCTION OF ICE STRUCTURES | 1997 |
|
RU2121037C1 |
RESIDENTIAL COMPLEX WITH INFRASTRUCTURE | 2011 |
|
RU2475611C2 |
SYSTEM FOR ILLUMINATING ICE CONDITIONS AND PREVENTING EFFECT OF ICE FORMATIONS ON SEA OBJECTS OF BUSINESS OPERATIONS | 2014 |
|
RU2583234C1 |
METHOD FOR ERECTION OF ICE STRUCTURES | 1994 |
|
RU2094570C1 |
Authors
Dates
2009-07-10—Published
2008-02-13—Filed