FIELD: construction industry. SUBSTANCE: method of destruction of ice cover includes installation of several charges of explosives in one area under ice and their successive demolition with time interval equal to period of propagation of flexural-gravity waves. EFFECT: enhanced efficiency of destruction of ice cover.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DESTRUCTION OF ICE COVER | 1996 |
|
RU2123662C1 |
METHOD FOR DESTRUCTION OF ICE COVER | 1999 |
|
RU2151998C1 |
METHOD OF DESTRUCTION OF ICE SHEET | 1994 |
|
RU2081393C1 |
METHOD FOR BREAKING OF ICE COVER | 2000 |
|
RU2180094C1 |
METHOD OF DESTRUCTION OF ICE COVER | 1997 |
|
RU2124178C1 |
PROCESS OF DESTRUCTION OF ICE COVER | 2000 |
|
RU2193751C2 |
METHOD FOR DESTRUCTION OF ICE COVERING | 2001 |
|
RU2221216C2 |
PROCESS DEMOLISHING ICE COVER | 2000 |
|
RU2193750C2 |
METHOD FOR BREAKING ICE COVERING | 0 |
|
SU1820188A1 |
DEVICE FOR BREAKING RIVERINE ICE JAM | 2004 |
|
RU2260170C1 |
Authors
Dates
1995-06-09—Published
1992-05-18—Filed