FIELD: blasting operations destroying ice cover. SUBSTANCE: process of destruction of ice cover includes preparation of gas space, installation of main explosive charge at certain depth under ice and its initiation. Gas space is prepared by means of gas generator producing heated gas before blast of main explosive charge. Gas generator is positioned under ice directly near lower ice edge at some distance along horizontal line from main explosive charge. EFFECT: increased efficiency of destruction of ice cover, diminished labor input. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS DEMOLISHING ICE COVER | 2000 |
|
RU2193750C2 |
METHOD FOR DESTRUCTION OF ICE COVER | 1999 |
|
RU2151998C1 |
METHOD OF DESTRUCTION OF ICE COVER | 1992 |
|
RU2037140C1 |
METHOD FOR DESTRUCTION OF ICE COVERING | 2001 |
|
RU2221216C2 |
METHOD FOR BREAKING OF ICE COVER | 2000 |
|
RU2180094C1 |
METHOD OF DESTRUCTION OF ICE COVER | 1996 |
|
RU2123662C1 |
METHOD OF MAKING ICE LOAD-CARRYING PLATFORM | 2001 |
|
RU2193621C1 |
METHOD OF DESTRUCTION OF ICE SHEET | 1994 |
|
RU2081393C1 |
METHOD OF MAKING ICE LOAD-CARRYING PLATFORM | 2001 |
|
RU2193620C1 |
PROCESS OF DESTRUCTION OF ICE JAM IN RIVERS | 2002 |
|
RU2225588C1 |
Authors
Dates
2002-11-27—Published
2000-06-06—Filed