FIELD: mining industry. SUBSTANCE: rocks are filled into dump by tiers. First, they are filled on retaining prism of inclined base up to horizon at which angle of inclined sliding surface equals angle of internal friction angle of rocks of said base over line of sliding, then, on active pressure prism. In so doing, formed on dump tier filled on retaining prism is working platform at horizontal distance from dump base determined by equation. Filling rocks on active pressure prism is started by extending tier working platform on retaining prism, at least, up to base boundary. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF BY-SLOPE MINERALS | 1994 |
|
RU2054120C1 |
METHOD FOR MINERAL OPENCAST MINING | 0 |
|
SU1788265A1 |
ROCK HEAP SPILLING METHOD | 0 |
|
SU1682573A1 |
METHOD OF DUMPING ONTO INCLINED BASE | 2012 |
|
RU2507397C1 |
METHOD OF DUMPING ON INCLINED BASE | 2002 |
|
RU2211333C1 |
PROCESS OF DUMP FORMATION | 1990 |
|
RU2007570C1 |
PROCESS OF FORMATION OF DUMPS | 0 |
|
SU1813878A1 |
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD FOR OPENCAST MINING OF INCLINED AND STEEPLY DIPPING MINERAL DEPOSITS | 1991 |
|
RU2027856C1 |
METHOD FOR OPENCAST MINING OF SLOPING AND STEEP DEPOSITS OF MINERALS | 1997 |
|
RU2148713C1 |
Authors
Dates
1995-07-09—Published
1991-11-25—Filed