FIELD: mining.
SUBSTANCE: method involves dumping of an initial tier of dump rocks onto an inclined base with height H that is determined based on the following condition:
EFFECT: possibility of stockpiling paste-like tails after concentrating ore processing onto the inclined base so that a dump tier stability is maintained.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DUMPING AT OPEN MINING OF MINERAL DEPOSITS | 2012 |
|
RU2509891C1 |
METHOD OF PILLING ON INCLINED BASE | 2013 |
|
RU2520611C1 |
METHOD OF DUMPING AT OPEN DEVELOPMENT OF MINERAL DEPOSITS | 2015 |
|
RU2604072C1 |
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS | 2017 |
|
RU2642903C1 |
DUMPING METHOD DURING DEVELOPMENT OF UPLAND QUARRIES | 2017 |
|
RU2658420C1 |
METHOD FOR FORMATION OF HILLSIDE ROCK DUMPS | 1991 |
|
RU2039266C1 |
METHOD OF OPEN MINING OF MINERAL DEPOSITS WITH FORMING OF DUMP WITH LARGE VOLUME AND HEIGHT IN DIFFICULT CONDITIONS | 2011 |
|
RU2543765C2 |
METHOD OF DUMPING ON INCLINED BASE | 2002 |
|
RU2211333C1 |
METHOD OF FORMING AN INTERNAL-EXTERNAL DUMP OF OVERBURDEN ON A PIT EDGE | 2024 |
|
RU2822182C1 |
METHOD OF OPENCAST MINING OF FLAT DEPOSITS UNDER PERMAFROST CONDITIONS | 2000 |
|
RU2206747C2 |
Authors
Dates
2014-02-20—Published
2012-08-20—Filed