FIELD: civil engineering. SUBSTANCE: tie of integrated roof structure provided with set runoff is made of sheets butted in the direction perpendicular to the runoff, and those having 5 10 mm gaps in the direction parallel to the runoff, or bevelled sheets being placed perpendicular and parallel about the runoff. Thermal insulating layer and tie are optionally made in the form of a plate of cellular concrete with bevels on upper and lower lengthwise edges to generate upper and lower steam/air removing channels. EFFECT: improved waterproofness. 3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ELIMINATING BULGES IN ROOFS | 0 |
|
SU889815A1 |
ROOFING STRUCTURE (VARIANTS) | 2003 |
|
RU2258120C2 |
METHOD FOR RESTORATION REPAIR OF ROOF COVERING | 1995 |
|
RU2143535C1 |
METHOD OF OVERHAUL OF FLAT ROOFING BY COVERING WITH PANELS | 2019 |
|
RU2728045C1 |
ROOFING | 0 |
|
SU836314A1 |
METHOD FOR ROOF COATING LAYING | 2003 |
|
RU2258119C2 |
METHOD FOR RECONSTRUCTION OF COMBINED ROOF | 2008 |
|
RU2393309C2 |
MONOLITHIC ROOF-PROTECTIVE COATING OF OPERATIONAL PURPOSE | 2010 |
|
RU2441121C1 |
TERRACE ROOF | 0 |
|
SU775259A1 |
ROOF COVERING AND MASTIC FOR IT | 2000 |
|
RU2190736C2 |
Authors
Dates
1995-07-25—Published
1993-01-15—Filed