FIELD: load lifting equipment. SUBSTANCE: lifting bridge crane has span beams, gallery, working platform guard by rails. Passed over sheaves are traction cables reeved on which provided with second drum. Working platform rail pillars are connected with guard rails and platform by hinge joint units. Mounted on bridge gallery on hinge joints are two equalizing sheaves through which traction cable is passed. EFFECT: enlarged operating capabilities. 4 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE CRANE | 2023 |
|
RU2820482C1 |
ARRANGEMENT FOR EMERGENCY EVACUATION OF CRANE OPERATOR | 0 |
|
SU1143682A1 |
APPARATUS FOR MOVING MAIN AND ADDITIONAL TROLLEYS OF TRAVELLING CRANE | 0 |
|
SU1104093A2 |
0 |
|
SU311853A1 | |
DEVICE FOR REPAIRING ELECTRIC HOISTS | 0 |
|
SU1426157A1 |
BRIDGE CRANE ASSEMBLY SYSTEM | 0 |
|
SU1752715A1 |
COLLAPSIBLE CANTILEVER CRANE | 2021 |
|
RU2774693C1 |
TRAVELLING GANTRY SELF-ASSEMBLING CRANE | 1992 |
|
RU2038283C1 |
DEVICE FOR EVACUATION OF CRANE OPERATOR IN EMERGENCY | 2001 |
|
RU2187454C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
Authors
Dates
1995-08-27—Published
1991-03-05—Filed