FIELD: engine engineering. SUBSTANCE: bottom level of heat accumulator 8 is at least no lower than the top level of top tank 4 of radiator 2. Discharging pipe line 12 is connected with the bottom part of branch pipe 3, the top part of the branch pipe being in communication with the top part of compensation tank 13. Tank 13 is additionally connected to the cooling space. Pump 10 is mounted inside supplying pipe line 9. EFFECT: enhanced efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
STARTING PREHEATER SYSTEM FOR INTERNAL COMBUSTION ENGINE | 1993 |
|
RU2075626C1 |
CITY BUS HEATING SYSTEM | 2001 |
|
RU2230929C2 |
DEVICE FOR PRESTART WARM-UP OF AUTOMOTIVE ICE | 2008 |
|
RU2377435C1 |
HEATING SYSTEM FOR INTERNAL COMBUSTION ENGINE | 0 |
|
SU739250A1 |
DEVICE FOR PREHEATING BEFORE STARTING AND TEMPERATURE CONTROL OF ENTERNAL COMBUSTION ENGINE | 2001 |
|
RU2217608C2 |
SYSTEM TO MAINTAIN OPTIMUM HEAT CONDITIONS OF ICE | 2012 |
|
RU2488015C1 |
INTERNAL COMBUSTION ENGINE HEATING SYSTEM | 1999 |
|
RU2170851C1 |
SYSTEM FOR MAINTENANCE OF ICE OPTIMUM HEAT CONDITIONS | 2014 |
|
RU2573435C2 |
COOLING SYSTEM OF STATIONARY INTERNAL COMBUSTION ENGINE | 2019 |
|
RU2707787C1 |
POWER PLANT | 0 |
|
SU1772401A1 |
Authors
Dates
1995-09-10—Published
1991-04-30—Filed