FIELD: mining industry. SUBSTANCE: method of explosion of combination charge consists in drilling of well 1, filling of it with explosives of different types, tamping with inert material 2 and initiation. Placed in the lower part of well 1 is high- blasting explosive 3 with a high velocity of detonation, having a high-negative oxygen balance, then ammonium nitrate 4, and a high-blasting explosive similar to explosive 3 is placed above it in the lower part of well 1, and again ammonium nitrate 4 is placed above it, whose mass and length is twice lesser than the total mass and length of the main (6) and additional (7) charges of explosive; the mass and length of ammonium nitrate 4 positioned between the main (6) and additional (7) charges of explosive equal the total mass and length of the main (6) and additional (7) explosive charges; the total mass and length of ammonium nitrate 4 in well 1 with respect to the total mass and length of industrial explosive in the main (6) and additional (7) explosive charges makes up 2/3; in this case linear initiators of increased weight of filler 8 are used as initiators of the main (6) and additional (7) explosive charges; trinitrotoluene blocks 9 are connected to the bottom part of the initiators, being positioned in the center of the main (6) and additional (7) explosive charges; the main (6) and additional (7) explosive charges are exploded simultaneously. EFFECT: facilitated procedure. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF PERFORMANCE OF DRILLING AND BLASTING OPERATIONS IN QUARRIES | 1997 |
|
RU2123661C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS | 2001 |
|
RU2184928C1 |
METHOD OF MANUFACTURING AQUATRINITROTOLUENE TYPE EXPLOSIVE | 1998 |
|
RU2144524C1 |
METHOD OF HOLE CHARGING | 1997 |
|
RU2133942C1 |
EXPLOSIVE COMPOSITION | 2004 |
|
RU2333191C2 |
EXPLOSIVE CHARGE (MODIFICATIONS) | 2006 |
|
RU2308667C1 |
METHOD OF MANUFACTURING BOREHOLE CHARGE | 1995 |
|
RU2080315C1 |
METHOD FOR PRODUCTION OF WATER-CONTAINING EXPLOSIVES | 2000 |
|
RU2204544C2 |
METHOD FOR FORMATION OF DEEP-HOLE CHARGE | 2003 |
|
RU2244900C1 |
CHARGE FOR BREAKING OF ROCKS | 2019 |
|
RU2712876C1 |
Authors
Dates
1995-09-10—Published
1993-08-03—Filed