METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION Russian patent published in 2010 - IPC E02D35/00 E02D27/08 

Abstract RU 2382146 C1

FIELD: construction.

SUBSTANCE: method for straightening of slant in building erected on pile foundation consists in the fact that new piles are installed in foundation grill of longitudinal external building wall arranged towards slant, and piles in foundation grill of longitudinal external building wall arranged on the side opposite to slant are "disconnected" from operation. In process of slant straightening, inside building basement, new piles arranged in separate section along their length are submerged into openings cut in foundation grill slab by indent device. Pile head is fixed in foundation grill slab with the help of metal cross beam and anchors embedded by high-strength glue into foundation grill openings. Then pit is dug near row of piles arranged on the building side, which is opposite to slant, and the pit provides for access to pile heads, which are cut by value Δ=ib, where i is slant of building, b is width of building towards slant. Heads of cut piles are previously strengthened by metal bands with sealants arranged by high-strength polymer compounds, and adjustment of bearing capacity Fd of new piles in process of slant straightening and building operation is carried out with the help of indent device, using cross beam, which is installed onto pile head, and using cross beam, jack is used to indent pile to the necessary force, afterwards cross beam is fixed by nuts on anchors till straightening and stabilisation of building slant. Indent device is dismantled, and after building slant has been straightened, cut piles are "connected" into operation with the help of concreting.

EFFECT: reduced labour intensiveness and improved reliability in process of building slant straightening, provision of slant adjustment in process of the following building operation.

3 dwg

Similar patents RU2382146C1

Title Year Author Number
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION 2010
  • Dmitrienko Aleksej Gennadievich
  • Glukhov Vjacheslav Sergeevich
  • Shirmanov Aleksandr Aleksandrovich
  • Suchkov Sergej Aleksandrovich
  • Murakaev Il'Nur Marsovich
RU2436899C1
METHOD OF PILE PRODUCTION BY IMPRESSION 2013
  • Striganov Jurij Pavlovich
  • Striganov Ivan Jur'Evich
  • Striganov Mikhail Jur'Evich
RU2554368C2
METHOD OF PRODUCING PILE BY IMPRESSION 2015
  • Striganov Yurij Pavlovich
  • Striganov Ivan Yurevich
  • Striganov Mikhail Yurevich
RU2595102C1
IMPRESSION PILE 2023
  • Striganov Iurii Pavlovich
RU2813841C1
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION 2016
  • Yurchenko Andrej Anatolevich
  • Veremejchik Anastasiya Sergeevna
RU2633619C1
METHOD FOR CONSTRUCTION OF PILE FOUNDATION 2015
  • Jurchenko Andrej Anatolevich
RU2581853C1
METHOD OF ERECTING FOUNDATION 2016
  • Yurchenko Andrej Anatolevich
  • Endzhievskij Lev Vasilevich
RU2626479C1
METHOD OF CONSTRUCTION PILE FOUNDATION 0
  • Pushkarevich Valerian Semenovich
  • Melnikov Aleksandr Iosifovich
  • Yablonskij Sergej Mironovich
  • Butenko Vladimir Ivanovich
  • Litvinchuk Grigorij Dmitrievich
  • Chernyj Konstantin Stepanovich
SU789649A1
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES 1993
  • Dranovskij A.N.
RU2068916C1
METHOD OF CONSTRUCTING PILE FOUNDATION 0
  • Efremenko Vladimir Mikhajlovich
  • Pushkarevich Valerian Semenovich
  • Romanov Dmitrij Andreevich
  • Udovichenko Vladimir Petrovich
  • Khokhol Viktor Veniaminovich
SU633986A1

RU 2 382 146 C1

Authors

Bronin Vladimir Nikolaevich

Striganov Jurij Pavlovich

Striganov Mikhail Jur'Evich

Kotov Nikolaj Viktorovich

Dates

2010-02-20Published

2008-08-04Filed