FIELD: hydraulic engineering. SUBSTANCE: method consists in unpulping the content of tailing pond and discharging it outside the pond. These procedures are conducted by layer-by-layer method in area of tailing pond; evacuation of each layer is discontinued at distance to dam equal to two or three heights between dam crest and surface of layer next to layer being removed. EFFECT: enhanced reliability. 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
SINGLE-STAGE DIKE OF TAILING DUMP | 2001 |
|
RU2198258C2 |
METHOD OF TAILING DUMP FORMATION | 2000 |
|
RU2162151C1 |
RADIOACTIVE TAILINGS STORAGE TECHNIQUE | 1991 |
|
RU2090946C1 |
TAILING DUMP | 2024 |
|
RU2826742C1 |
TECHNIQUE ENLARGING CAPACITY OF SETTLING BASIN OF TAILING DUMP | 2000 |
|
RU2162942C1 |
METHOD OF JOINT CONSTRUCTION AND RESTORATION OF TAILING DUMPS | 2006 |
|
RU2335631C2 |
A METHOD STACKING CONCENTRATION TAILINGS | 0 |
|
SU1687725A1 |
METHOD OF DUST CONTROL ON TAILING DUMPS | 2020 |
|
RU2766074C1 |
METHOD OF PRODUCING THE SCREEN OF TAILS POND BED | 0 |
|
SU1395739A1 |
PROCESS OF ERECTION OF ALLUVIAL MAN-MADE DEPOSIT | 2000 |
|
RU2186902C1 |
Authors
Dates
1995-09-27—Published
1992-08-07—Filed