FIELD: seismic prospecting blasting works. SUBSTANCE: station has transportation mean 1, blasting line 3. Support 4 and trailer 6 using cable 5 are linked to transportation mean 1. EFFECT: increased accuracy. 2 cl, 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| BURSTING POINT STATION | 1998 |
|
RU2142149C1 |
| SYSTEM FOR SEISMIC EXPLORATION | 2005 |
|
RU2298207C1 |
| EXPLOSION POST STATION | 2005 |
|
RU2290670C1 |
| PASSENGERS AND CARGOES AIR TRANSPORTATION AND SYSTEM TO THIS END | 2012 |
|
RU2549728C2 |
| SEISMIC SIGNAL WELL SOURCE | 1992 |
|
RU2012022C1 |
| METHOD OF MINING UNDER-PIT PART OF MINERAL DEPOSITS | 2023 |
|
RU2813518C1 |
| METHOD FOR DETERMINING AN EXPLOSION PULSE OF AN EXPLOSIVE CHARGE / AMMUNITION IN NEAR ZONE | 2018 |
|
RU2681721C1 |
| METHOD TO ELIMINATE HEEL OF SUPPORTS IN RESTRICTED AREAS | 2009 |
|
RU2431019C2 |
| DEVICE FOR EMERGENCY BRAKING OF TRANSPORT VEHICLE | 2007 |
|
RU2370385C2 |
| GEOPHONE | 1993 |
|
RU2092873C1 |
Authors
Dates
1995-10-20—Published
1992-12-31—Filed