FIELD: civil engineering. SUBSTANCE: roll half-finished piece is made of unified sheets 1 connected to one another with horizontal weld joints 2 and vertical ones 3 to form a strip with allowance on end sheets. The strip has end sections 9 for each belt free from horizontal weld joints 2. Method for erecting a wall of cylindrical reservoir of roll half-finished piece includes unwrapping the roll half-finished piece placed in vertical position, fitting its edges followed by cutting allowance alternatively over the belts beginning from outer and inner edges, forming field closing weld joint over horizontal and vertical edges of the strip. Preliminary in making the strip, end sections 9 free of horizontal weld joints, with section length exceeding half radius of the roll for any belt, are connected using temporal weld joint 10 of the length less than one tenth roll radius beginning from vertical edges 4 of the strip. Then end sections 9 shape forming, and assembly of vertical butt on individual belts, beginning field operations from any belt are carried out. EFFECT: increased quality and decreased labour consumption. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MOUNTING ROLLED SHEETS FOR TANK WALLS | 0 |
|
SU1730407A1 |
METHOD OF ERECTING ROLL RESERVOIRS WITH STEPPED FIELD JOINTS OF WALLS | 1997 |
|
RU2121555C1 |
DEVICE TO COUPLE VERTICAL BUTT-JOINT OF A CYLINDRICAL RESERVOIR | 1992 |
|
RU2037619C1 |
METHOD OF PRODUCING CYLINDRICAL RESERVOIRS | 0 |
|
SU1442302A1 |
METHOD FOR PRODUCTION AND ERECTION OF RESERVOIRS FROM ROLLED MATERIAL | 1995 |
|
RU2083783C1 |
METHOD TO REPAIR VERTICAL WALL OF VERTICAL STEEL RESERVOIR | 2013 |
|
RU2559987C2 |
RESERVOIR FOR STORAGE OF EASILY EVAPORATING LIQUIDS | 1993 |
|
RU2032052C1 |
METHOD OF MAKING CONICAL VESSEL FOR STORING LOOSE MATERIALS | 0 |
|
SU876933A1 |
METHOD OF PRODUCING BOTTOM AND COVER BLANKS | 0 |
|
SU1026907A1 |
METHOD OF PRODUCING MULTILAYER CYLINDRICAL VESSELS | 0 |
|
SU867486A1 |
Authors
Dates
1995-10-27—Published
1992-12-02—Filed