FIELD: boreholes cementing. SUBSTANCE: method provides for pumping-in of viscous plastic solution. Clay solution with clay granules is used for pumping-in. Water share in solution is taken equal to water capacity of clay in solution and in clay granules. Sizes of used clay granules do not exceed half difference of borehole and casing string diameters. Granules are added with polyacrylamide according dependance: lg tb.g. 1 11.5 K, where tb.g. planned time of beginning of granules disintegration, minutes; K concentration of polyacrylamide in composition of granules, in mass Viscous plastic solution pumping-in is exercised within time period till granules disintegration. Using the viscous plastic solution, they substitute drilling solution in drill string-borehole annulus. EFFECT: Usage of viscous plastic solution allows to withdraw casing strings. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIR OF PRODUCTION CASING STRING IN WELL | 1995 |
|
RU2092673C1 |
PROCESS PLUGGING CASING STRING IN WELL | 2002 |
|
RU2223387C1 |
METHOD FOR CASING LANDING IN WELL | 0 |
|
SU1639122A1 |
METHOD OF CONTROL OF INTERSTRING AND ANNULUS CROSS-FLOWS OF GAS IN WELLS (VERSIONS) | 2001 |
|
RU2213843C2 |
METHOD FOR PREVENTING OIL/GAS/WATER MANIFESTATION AND INTER- STRATUM CROSS OVER IN BEYOND STRING SPACE | 1993 |
|
RU2061169C1 |
METHOD FOR ELIMINATION OF INTER-STRING AND BEHIND-STRING GAS CROSS-FLOW IN WELLS | 2001 |
|
RU2228429C2 |
METHOD OF SECONDARY OPENING UP OF PRODUCING FORMATION | 1999 |
|
RU2143057C1 |
METHOD TO ELIMINATE INTERSTRING AND STRING CROSSFLOWS OF GAS IN WELLS ( VARIANTS ) | 2001 |
|
RU2219326C2 |
PROCESS OF ISOLATION OF INFLOW OF STRATAL WATER | 2000 |
|
RU2186935C2 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
Authors
Dates
1995-10-27—Published
1991-04-29—Filed