FIELD: oil/gas production, mining, in particular. SUBSTANCE: grating solution is pumped in beyond string spacing. The solution is subject to temperature and pressure cycling. Interstratum insulating crossovers are formed. Grating solution is subject to pulsed pressure when decaying frequency and amplitude. Grating solution heating is carried out with increased background temperature for the given depths by 30 - 60 C. Formation of interstratum insulating crossovers are controlled by thermoacoustic measurements in a borehole in waiting solidification of grating solution. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF INTERSTRATAL ISOLATION BRIDGING PLUGS IN WELL ANNULAR SPACE | 2001 |
|
RU2196875C1 |
METHOD OF WELL CEMENTING | 1998 |
|
RU2157881C2 |
METHOD FOR WELL CEMENTATION | 1992 |
|
RU2023137C1 |
PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
METHOD FOR PREVENTING OCCURRENCE OF INTER-CASING AND INTER-LAYER FLOWS IN WELL | 2023 |
|
RU2808074C1 |
METHOD OF WELL ABANDONMENT | 2012 |
|
RU2499127C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD OF SECONDARY OPENING OF PRODUCING FORMATION | 1999 |
|
RU2163291C2 |
WEIGHTED EXPANDING GROUTING MORTAR | 1999 |
|
RU2170809C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2018 |
|
RU2684932C1 |
Authors
Dates
1996-05-27—Published
1993-04-13—Filed