FIELD: underwater development of mineral deposits. SUBSTANCE: after detecting boundaries 1 of developed district, direction of movement of drifts is determined. Direction 3 of advance of development is selected in direction of drift movement. Placer is worked through its entire thickness to open the placer bed. After working of area 4 to sizes not excluding the self-restoration of biocenoside associations, stoping operations are discontinued until restoration of natural productivity of water area within worked district. Further on, area 5 is worked, and following next interval of time, area 6 is worked. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERWATER PLACER DEPOSIT DEVELOPMENT | 2006 |
|
RU2322584C1 |
METHOD FOR UNDERWATER PLACER DEPOSIT DEVELOPMENT | 2006 |
|
RU2322585C1 |
METHOD OF PRODUCTION OF SOLID MINERAL RESOURCES FROM ARCTIC SHELF BED | 2015 |
|
RU2615192C1 |
METHOD OF UNDERWATER MINING | 1995 |
|
RU2097565C1 |
METHOD OF EXTRACTING MINERALS FROM BOTTOM OF ARCTIC SHELF | 2024 |
|
RU2822857C1 |
METHOD OF PLACER DEPOSIT DEVELOPMENT | 1997 |
|
RU2131034C1 |
METHOD FOR MINING OF INUNDATED PLACERS | 1991 |
|
RU2011826C1 |
METHOD OF PLACER DEPOSIT DEVELOPMENT | 1997 |
|
RU2131036C1 |
METHOD OF QUARRIES RECLAMATION (VERSIONS) | 2010 |
|
RU2433268C1 |
PROCEDURE FOR DEVELOPMENT OF PLACERS | 2009 |
|
RU2390627C1 |
Authors
Dates
1995-11-27—Published
1991-06-07—Filed