FIELD: preparing and conveying cast asphalt. SUBSTANCE: device has thermally insulated hopper 2 installed on chassis of a vehicle. Front part of the hopper may be lifted in lengthwise vertical surface. Loading holes 4 are originated in hopper 2. Dump neck and air ducts 7 are placed in hopper walls. Stirrers with blades and perforated containers for components of the cast asphalt are installed inside the hopper. Lower parts of hopper side walls are open to air ducts for catalyzer loading. EFFECT: high productivity. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CARRYING, MIXING, DISCHARGE, AND PLACEMENT OF THERMOPLASTIC MATERIALS | 1998 |
|
RU2141549C1 |
PUMP UNIT FOR VISCOUSE AND NONHOMOGENEOUS LIQUIDS | 0 |
|
SU1469207A1 |
MIXING PLANT FOR PREPARATION OF SOLUTIONS | 2000 |
|
RU2184204C2 |
GARBAGE TRUCK FOR TRANSPORTATION OF SOLID WASTE WITH A VOLUME FROM 10 TO 25 CUBIC M WITH ROTOR TYPE GRINDING AND PRESSING FUNCTION | 2023 |
|
RU2803651C1 |
MOBILE MIXING PLANT FOR PRODUCTION OF MATERIALS FOR ROAD CONSTRUCTION | 2022 |
|
RU2794266C1 |
DEVICE FOR PRODUCTION OF POROUS GRANULATED AMMONIUM NITRATE AND METHOD FOR PRODUCTION OF POROUS GRANULATED AMMONIUM NITRATE | 2010 |
|
RU2452719C2 |
PLANT FOR PRODUCING NICOTINIC ACID | 2004 |
|
RU2275958C2 |
BUNKER TRANSFORMATION MECHANISM | 2011 |
|
RU2483527C2 |
DUMP TRUCK FOR TRANSPORTATION OF GRANULATED MATERIAL (VERSIONS) | 2018 |
|
RU2685488C1 |
UNIVERSAL GENERATING SET OF HEAT GAS FLOW ON TANK CHASSIS | 2004 |
|
RU2273816C1 |
Authors
Dates
1996-01-27—Published
1994-05-18—Filed