FIELD: well repairs. SUBSTANCE: made in flow string are filling holes. Main and additional packer members are installed in filling string before its lowering. Number of additional packer members should correspond to the number of producing formations. They are installed between producing formations. Then, filling string is run into well and filling string-to-casing annulus is separated. Separation is effected in zone of producing formations and in zone of special holes. Isolation material is injected under pressure. Injection is accomplished concurrently with separation of filling string-to-casing annulus. Duration of separation, at least, equals the duration of injection of isolation material. EFFECT: higher efficiency of repair and isolation work in zone of producing formations distributed over the well bore. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ISOLATION OF FORMATIONS IN WELL AND DEVICE FOR INJECTION OF ISOLATING MATERIAL | 2001 |
|
RU2211302C1 |
DEVICE FOR WORKOVER OF WELLS | 1994 |
|
RU2095541C1 |
PACKER | 1991 |
|
RU2010947C1 |
METHOD OF ISOLATING SATURATED UPPER PART OF PRODUCING FORMATION | 0 |
|
SU1498911A1 |
DEVICE FOR INJECTION OF ISOLATING MATERIAL INTO WELL | 2003 |
|
RU2215123C1 |
METHOD OF ISOLATING WATER-SATURATED CENTRAL PART OF PRODUCING FORMATION | 0 |
|
SU1490259A1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
DEVICE FOR SEPARATING BEDS IN A WELL | 2004 |
|
RU2255203C1 |
METHOD OF ISOLATING WATER-SATURATED LOWER PART OF PRODUCING FORMATION | 0 |
|
SU1490258A1 |
CUTOFF VALVE | 2005 |
|
RU2293839C1 |
Authors
Dates
1996-01-27—Published
1991-01-30—Filed