FIELD: bridge building. SUBSTANCE: left-hand carrying cable is connected with cable suspensions to right-hand stiffening beam face in end quarters of bridge span. In the area of middle part of the span right-hand carrying cable is connected to left-hand face of stiffening beam. EFFECT: high strength. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTIPLE-CABLE SUSPENSION BRIDGE | 1993 |
|
RU2068907C1 |
SUSPENSION BRIDGE | 1993 |
|
RU2074282C1 |
SUSPENSION BRIDGE | 1993 |
|
RU2057835C1 |
SUSPENSION BRIDGE | 1992 |
|
RU2057833C1 |
SUSPENSION BRIDGE | 1993 |
|
RU2074281C1 |
SUSPENSION BRIDGE | 1994 |
|
RU2100522C1 |
TWO-WAY SUSPENSION BRIDGE AND METHOD OF ERECTING SAME | 0 |
|
SU1214816A1 |
PRESTRAINED SUSPENSION BRIDGE | 0 |
|
SU1425265A1 |
SUSPENSION BRIDGE | 0 |
|
SU1434021A1 |
ASYMMETRICAL SUSPENSION BRIDGE | 0 |
|
SU1645335A1 |
Authors
Dates
1996-04-10—Published
1993-08-25—Filed